为考虑吊模安装 , 铝模提供二种现场施工方案 , 方案一:吊模现场放马凳加定位筋等处理 , 方案二:通过楼板面打孔 , 胶管支撑处理(注:方案二施工完后板面会有洞口 , 要注意防水及填补需项目部后期自行处理) , 请确认选用那种施工方案;
In order to consider the hanging mold installation the aluminum mold provides two kinds of on-site construction schemes. The first scheme: the hanging mold on the scene the horse stool and the positioning ribs etc. the second scheme: through the floor surface punching the hose support processing (Note: after the construction of the second project) There should be a hole in the surface of the board. Pay attention to waterproofing and fill it in the later part of the project. Please confirm the construction plan.